|
||||||||||||||||||||||||
|
the perfect fit Our business thrives on word of mouth recommendation. Why? Because we go further than any other company to ensure our clients get the very best quality of product and service.The perfect roofline finish can only be achieved by following the QFI perfect fit process:
Roof tiles are moved back as required to remove old felt and inspection of timber tresses replaced with tanalised timber of required. New eaves protection system installed under tiles to BBA specification Replacement Fascia Board 22mm, thermally insulated Grade 1 virgin uPVC with 40% injected acrylic to BBA standard Replacement
tongue in groove 10mm multi-chambered air channelled soffit fixed with
65mm galvanised steel ring shank poly prop head pins Installation of circular vents to ensure timber can breathe and avoidance of condensation to NHBC rules and regulations Replacement of box ends Removal of existing cemented apex and replacement dry verge tiles or continuous dry verge as installation requires Complete removal of all debris and materials Removal of any asbestos materials as licensed by Health and Safety executive and LCAPS.
To find out more contact our sales advisors.
|
|
||||||||||||||||||||||